Established 1984 — London

From structure to handover.

A main contractor delivering complex commercial, residential and public-sector buildings across the UK — on programme, on budget, and to the standard the drawings promised.

Complex buildings across the UK, delivered on programme and on budget.

Loading sequence 0%
Selected clients Solstice Properties Thameswood Council Meridian NHS Foundation Trust Fenwick University Harcourt Real Estate Partners Aldermoor Pension Fund

Two hundred and seventeen buildings. One standard of delivery.

Grosvenor Construction Group takes projects from £5m to £150m — from the first feasibility drawing to the final certificate — under a single point of responsibility.

We work across commercial, residential, science and technology, education and industrial sectors, with directly employed site management and a supply chain we have used for decades. Where a programme is tight or a site is constrained, that continuity is the difference between a date on a Gantt chart and a date you can hand to your tenants.

0yrs
Delivering since 1984
£0m
Annual turnover
0
Projects delivered
0
Accident frequency rate
01 — Capabilities

Six sectors.
One delivery team.

We do not subcontract our judgement. Every sector below is run by people who have built in it for years, supported by the same preconstruction, commercial and safety functions.

01

Commercial & Workplace

Grade A office new-build, CAT-A and CAT-B fit-out, and refurbishment of occupied buildings across the City and West End.

02

Residential & Mixed-Use

Build-to-rent, private sale and affordable housing, including podium retail and multi-level basement construction.

03

Science & Technology

Laboratory, cleanroom and CL2 containment builds with fully integrated MEP design, installation and validation.

04

Education

Schools, higher-education faculties and student accommodation, delivered alongside live term-time operation.

05

Industrial & Logistics

Distribution centres, manufacturing facilities and last-mile hubs delivered to BREEAM Excellent as standard.

06

Heritage & Refurbishment

Listed façade retention, structural strengthening and sensitive intervention within protected settings.

02 — Leadership

Run by people who
have built before.

Four people carry accountability for every live site. None of them are new to this — that is deliberate.

Richard Ashcombe

Managing Director

Twenty-six years in UK main contracting. Joined as Commercial Director in 2009, appointed MD in 2016.

Priya Nathwani

Commercial Director

Chartered quantity surveyor. Leads cost certainty and contract strategy across the live portfolio.

Daniel Okafor

Operations Director

Oversees delivery across all live sites. Twenty years running complex fit-out and new-build programmes.

Eleanor Voss

Director of Sustainability & HSQE

Chartered engineer. Sets the net zero roadmap and owns health, safety and quality across the business.

03 — Selected work

Recently handed over.

Six projects completed between 2023 and 2025. Values, durations and areas as built.

Commercial One Ashdown Place — completed office tower with Portland stone piers and bronze framing

One Ashdown Place

City of London

Grade A office tower with a double-height reception, terraced upper floors and a CAT-A fit-out handed over eleven weeks ahead of programme.

Value
£96m
Completed
2024
Area
41,000 m²
Storeys
24
Residential Blackfriars Yard — brick residential blocks around a landscaped courtyard

Blackfriars Yard

Southwark

Two residential blocks over a retail podium and a two-level basement, built on a constrained riverside site with river-borne logistics.

Value
£74m
Completed
2023
Homes
212
Duration
31 mths
Science & Tech Meridian Life Sciences Campus — laboratory building with vertical solar fins

Meridian Life Sciences

Cambridge

Laboratory and office campus including CL2 containment suites, delivered under a two-stage design and build contract with early contractor involvement.

Value
£120m
Completed
2025
Area
18,400 m²
BREEAM
Excellent
Education St Aldate's Learning Quarter — limestone academic building with timber fins

St Aldate's Learning Quarter

Oxford

Academic building and library extension completed within a live college estate and a conservation area, with all noisy works outside term time.

Value
£38m
Completed
2024
Area
6,900 m²
Duration
26 mths
Industrial Kestrel Park — large distribution centre with loading docks at dawn

Kestrel Park

Milton Keynes

BREEAM Excellent distribution centre with 38 dock levellers, a 1.4 MW rooftop PV array and a two-storey office pod, delivered in 14 months.

Value
£52m
Completed
2023
Area
44,600 m²
Docks
38
Heritage Marylebone Court — restored Victorian façade beside a bronze and glass extension

Marylebone Court

London W1

Grade II façade retention with a new steel frame and bronze-clad extension behind the retained elevation, monitored throughout by structural instrumentation.

Value
£29m
Completed
2025
Area
4,200 m²
Listing
Grade II

Grosvenor delivered Blackfriars Yard through a genuinely difficult site and a live river-logistics constraint, and did it without a single missed reporting cycle. That predictability is worth more to us than a headline programme date.

Head of Development — Solstice Properties
04 — Approach

Certainty is designed in,
not chased later.

Most programme overruns are decided before the ground is broken. We front-load the work that removes them.

01

Preconstruction

Feasibility, buildability review, programme and cost certainty established before a spade goes in the ground.

02

Design Management

We coordinate the design team, resolve interfaces early and freeze information ahead of procurement.

03

Construction

Directly employed site management, a vetted supply chain, and weekly cost and programme reporting you can audit.

04

Handover & Aftercare

Commissioning, O&M, soft landings and a twelve-month defects period with a named contact who was on site.

How we contract
Design & Build Single point of responsibility from RIBA Stage 2 onward.
Two-Stage / ECI Early contractor involvement, cost certainty locked before Stage 2 concludes.
Construction Management Direct trade contracts, with design control retained by the client team.
Traditional (JCT) Fully designed schemes procured against a fixed lump sum.
05 — Sustainability

Building to a
lower footprint.

Net zero is a contract requirement on most of the public-sector work we tender for now, not an aspiration. We report against it the same way we report cost and programme — monthly, and to the client.

2045
Net zero target, scopes 1 & 2
94%
Projects BREEAM Excellent or above
97%
Construction waste diverted from landfill
38%
Embodied carbon reduction since 2019
06 — Assurance

Accredited, audited,
and insured to scale.

Prequalification should take an afternoon, not a fortnight. Everything a client team normally asks for is held current and ready to issue.

Quality ISO 9001 Quality management system, certified and externally audited annually.
Environment ISO 14001 Environmental management, including site waste and carbon reporting.
Safety ISO 45001 Occupational health and safety management across all live sites.
Prequalification Constructionline Gold Financial, insurance and capability checks verified and current.
Compliance CHAS Elite Health and safety competence assessed to the highest CHAS tier.
Community Considerate Constructors Registered on every site, with published scores available on request.
07 — Contact

Tell us about
the project.

Send us a drawing set, a site address or a rough idea. We will come back within two working days with a view on programme and cost.

Head office
Grosvenor House, 44 Bankside
London SE1 9PZ
Regional offices
Manchester — St Ann's Square
Birmingham — Colmore Row
Telephone
+44 20 7946 0112
Hours
Monday to Friday, 07:30 — 18:00

We use your details only to respond to this enquiry.

Thank you — your enquiry has been recorded. A member of the preconstruction team will respond within two working days.